Terrain and construction


The last two years we worked hard to achieve a basic infrastructure, starting with a new fosse septic for the new small and later large new sanitairbuilding.

Electricity and water are put into the ground to several locations at the campsite.



A new road up to our sampsite has been made and the parking is realized.


We have equalized the large and slanted terrain and some plateaus arise. So the area has many different levels, each with their own views.




The campsite has no defined sites, but a number of fields, all of which can be used. At each plateau electricity is available.






For smaller tents, it's even possible to camp in our orchard,


between and among the apples.


From a small and old building a double toilet is made and the old pig stable is transformed into a double shower.
As of 2012 our new shower and toilet building is ready.